
Grid
Sinoma's 36 MWp Solar Plant Connects
A 36 MWp solar PV project at the CNBM Zambia Industrial Park has been connected to the national grid. The plant, combined with a waste-heat recovery system, will generate 110 million kWh annually to power the industrial park and feed surplus electricity into the grid.